EXP Computer S200 用户手册

下载
页码 162
44 
Bridging
Configuring the PathBuilder S200 Series Switch for Bridging Operation
5) The PathBuilder S200 series switch transfers a copy of the ARE frame from the 
LAN Port across LAN Bridge Link number 1 to the Bridge (Figure 24). Since the 
frame is an All Routes Explorer, the Bridge broadcasts the frame across each of 
the existing WAN Bridge Links (32 max) to the WAN Adapter module.
6) The WAN Adapter transmits each ARE frame to a separate, already established 
SVC which connects it across the WAN to a remote node (Figure 25). Note that 
in the node attached to LAN AAA, three bridge links (5, 6, and 7) to the WAN 
side are necessary because they go to the three remote LANs to establish 
complete bridges to those LANs. The three right-hand nodes really need only one 
WAN Bridge Link each, but two additional ones are shown; they could be 
attached to other bridges in other nodes not shown.
Figure 24. PathBuilder S200 Series Switch Transfers a Copy of ARE 
Frame to the Bridge Module
WAN
Adaptor
5
6
7
WAN
Port
Port
55
1
LAN
AAA
PC
ARE Frame
ARE Frame
ARE Frame
Bridge
LAN Bridge Link
WAN Bridge Links
SVCs
(PVCs for Frame Relay)