Dukane 8934 用户手册

下载
页码 56
46
4.2 Event Scheduling
The scheduling function enables to setup scheduled events including power on / 
power off. It enables to be “self-management” projector. 
• You can schedule the following control events: Power, Input Source. 
(&20)
• The power on event has the lowest priority among the all events that are 
defined at the same time. 
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (&19)
• The priority for scheduled events is as follows 1) specific date 2) weekly 3) 
daily.
• Up to five specific dates are available for scheduled events. Priority is given to 
those with the lower numbers when more than one event has been scheduled 
for the same date and time (e.g., ‘Specific date No. 1’ has priority over ‘Specific 
date No. 2’ and so on. 
• Be sure to set the date and time before enabling scheduled events. (&21
Once you turn off the projector in the SAVING mode (&
SETUP menu in the 
Operating Guide) or the AC power, the current date and time setting is reset.
NOTE
4. Other Functions