American Power Conversion AP9615 用户手册
8
Installation
procedure,
continued
5 Secure the hub with the screws removed in Step 3.
6 Using straight-through
UTP
cables, connect the Sta-
tion ports (
1X–4X
, in any order) to each worksta-
tion’s
10Base-T
port or to the Uplink port of a hub to
7 Connect the Uplink port, if applicable:
• If connecting to another hub:
– Use a straight-through cable to connect to a Sta-
– Use a crossover cable to connect to the Uplink
• If connecting the Uplink port to a workstation or
other non-hub device:
8 Turn on the
UPS
or device that now houses the hub.
To turn on the
UPS
or device, follow the appropriate
procedure listed below:
Smart-
UPS
a Plug the
UPS
back into the AC
power outlet
.
b Press and hold the Power On button until you
hear a click and beep or until the power LED
illuminates.
illuminates.
c Power on the connected equipment.
Matrix-
UPS
a Turn on the circuit breaker on the bottom left
side on the back panel of the
UPS
.
b Turn on the UPS via the front panel.
c Power on the connected equipment.
Continued on next page