InSinkErator AS-101K 用户手册

下载
页码 12
9
120 V
1-phase
1/2 to 2 HP
(FNA2)
2
3
4
6
7
M1
M3
M2
M4
M6
4
M1
M4
6
11
9
4
L1
L2
9
7
7
11
12
13
2
4
4
L1
L2
INCOMING
POWER
PANEL
GROUND
LUG
GROUND
6
6
6
3
7
L1
L2
4
4
2
10
7
STOP
START
12
10
X2
24V WATER
SOLENOID VALVE
MOUNT IN LINE
1 GPM
FLOW CONTROL
FUSE
XF
H1
H3
H2
H4
L2
PRINTED
CIRCUIT
BOARD
13
14
L2
WATER
SHUTOFF
DELAY
M2
M5
M7
1
2 4
6
5
7
6
M6
M5
24V WATER
SOLENOID VALVE
MOUNT IN LINE
X GPM
FLOW CONTROL
4
M7
7
7
M7
NC
NC
7
3
(FNA2)
DISPOSER
MOTOR
2
3
4
6
7
M1
M3
M2
M4
M6
4
M1
6
11
9
4
L1
L2
9
7
7
11
12
13
2
4
4
L1
L2
INCOMING
POWER
PANEL
GROUND
LUG
GROUND
6
6
6
3
7
L1
L2
4
4
2
10
7
STOP
START
12
10
X2
24V WATER
SOLENOID VALVE
MOUNT IN LINE
1 GPM
FLOW CONTROL
FUSE
XF
H1
H3
H2
H4
L2
PRINTED
CIRCUIT
BOARD
13
14
L2
 OFF
 ON
WATER
SHUTOFF
DELAY
M2
M5
M7
1
2 4
6
5
7
6
6
M6
M5
24V WATER
SOLENOID VALVE
MOUNT IN LINE
7 GPM
FLOW CONTROL
4
M7
7
7
AC CURRENT
SENSOR
1
2
3
4
5
4
7
7
14
TRIP
DELAY
TRIP
POINT
M7
NC
NC
7
3
M4
AS-101K-1 Wiring Diagram
Call Toll Free 1-800-845-8345 
for the nearest InSinkErator 
Authorized Service Agency or  
to reach Technical Support.
ELECTRICAL SHOCK
 • Turn off the electrical supply to the disposer before 
attempting any work on it. Use a voltmeter or  
circuit tester to ensure that power is off.
 • Installation must conform to local electrical codes.
 • All control centers and disposers must be carefully 
and permanently grounded.
 • A properly fused disconnect must be installed at 
the electrical supply source for the control center.
PROPERTY DAMAGE
 • Ensure that the control center voltage and phase 
match the disposer motor and electrical supply. 
Check nameplates on disposers and control  
centers for voltage and phase specification.
 • The disposer motor wiring connection is shown in 
the disposer terminal box.