Quick-Start Guide for Remote Access Concentrators
118352-A Rev. A
Task 1: Order Line Provisioning
The lines are ordered through the telco before the RAC is installed.
Typically this is done after the sales order is placed. The supported switch
types and switch parameters are described in Provisioning WAN Lines
for Remote Access Concentrators. You should have the switch type and
parameter values before continuing with the install.
Typically this is done after the sales order is placed. The supported switch
types and switch parameters are described in Provisioning WAN Lines
for Remote Access Concentrators. You should have the switch type and
parameter values before continuing with the install.
Task 2: IP Addresses
You must be prepared to enter the following addresses during the
configuration procedure:
configuration procedure:
•
Internet address
•
Subnet mask
•
Broadcast address
•
Preferred load host
•
Preferred dump host
•
Load/Dump gateway address
Task 3: Boot Sequence
You must decide which boot sequence you want to use. You can choose
a network boot (net), self boot (self), or both. Typically, you would select
both (net and self).
a network boot (net), self boot (self), or both. Typically, you would select
both (net and self).