Nortel 5399 快速安装指南

下载
页码 34
3
    Quick-Start Guide for Remote Access Concentrators
118352-A Rev. A
Task 1: Order Line Provisioning
The lines are ordered through the telco before the RAC is installed.
Typically this is done after the sales order is placed. The supported switch
types and switch parameters are described in Provisioning WAN Lines
for Remote Access Concentrators
. You should have the switch type and
parameter values before continuing with the install.
Task 2: IP Addresses
You must be prepared to enter the following addresses during the
configuration procedure:
Internet address
Subnet mask
Broadcast address
Preferred load host
Preferred dump host
Load/Dump gateway address
Task 3: Boot Sequence
You must decide which boot sequence you want to use. You can choose
a network boot (net), self boot (self), or both. Typically, you would select
both (net and self).