Cisco Cisco ONS 15600 Multiservice Switching Platform (MSSP) 安装指南

下载
页码 26
 
15
Upgrading the Cisco ONS 15600 to Release 8.0
OL-10633-01
DLP-  U334 Accept the New Load
DLP-U334 Accept the New Load
Step 1
In node view, click the Maintenance tab and then click the Software button.
Step 2
Click the Accept button. The process takes approximately 2 to 5 minutes.
Note
You can reject the new software load by clicking the Cancel button. The Cancel button resets the 
active TSC card in Slot 5. The TSC card in Slot 10 then becomes the active TSC, using the 
pre-upgrade software version. 
Note
If the Cancel button is not active, the standby TSC has not finished acquiring the active timing 
reference. The acquire process can take approximately 10 to 15 minutes. When the acquire 
process completes, the Cancel button becomes active.
Step 3
Verify the version:
a.
Click Info.
b.
In the Current Software Info dialog box, verify that the TSC B Working field shows the correct 
version. The TSC B Protect field should show the previous version. 
c.
If the TSC B Working and TSC B Protect fields show none, click OK and click the Info button again 
after several minutes. Repeat until the TSC B software versions appear.
d.
Click OK.
Step 4
Return to your originating procedure (NTP).
DLP-U335 Remove the BLSR Lockout
Purpose
This task upgrades the standby TSC.
Tools/Equipment
PC or UNIX workstation
Prerequisite Procedures
Required/As Needed
Required
Onsite/Remote
Onsite or remote (but in the presence of the workstation)
Security Level
Superuser
Purpose
Release the span lockouts on all BLSR nodes. Complete this task after the 
new software load is activated on all nodes.
Tools/Equipment
PC or UNIX workstation
Prerequisite Procedures
Required/As Needed
Required for BLSR
Onsite/Remote
Onsite or remote (but in the presence of the workstation)
Security Level
Superuser