Cisco Headend System Release 2.7 發佈版本通知

下载
页码 198
 
Chapter 4    Post-Upgrade Procedures 
 
 
 
108 
4019475 Rev D 
13  Click Process and then select Start Process. In a few minutes, the indicator for 
the osm process changes from red to green. 
14  Press the Options button on the front panel of the BFS QAM until the Session 
Count total appears. 
15  Wait about 10 minutes for the system to rebuild the sessions. 
16  Does the Session Count total now equal the number of sessions you recorded in 
the Checking the BFS Sessions on the BFS QAM or BFS GQAM (on page 48) 
procedure? 
 
If yes, go to Verifying a Successful Installation (on page 108). The system has 
recovered all of the BFS sessions. 
 
If no, call Cisco Services for assistance. 
 
Verifying a Successful Installation 
1  Complete the following steps to perform a slow boot and a fast boot on a DHCT 
with a working return path (2-way mode). 
a  Boot a DHCT. 
Note:  Do not press the Power button. 
b  Access the Power On Self Test and Boot Status diagnostic screen on the 
DHCT and verify that all parameters, except UNcfg, display Ready.  
Note:  UNcfg displays Broadcast. 
c  Wait 5 minutes. 
d  Press the power button on the DHCT. Power to the DHCT is turned on. 
e  Access the Power On Self Test and Boot Status diagnostic screen on the 
DHCT. 
f  Do all of the parameters, including UNcfg, display Ready
– 
If yes, go to step 2. 
– 
If no, contact Cisco Services. 
2  Ping a test DHCT. 
3  Did the DHCT receive the ping? 
 
If yes, go to step 4. 
 
If no, call Cisco Services. 
4  Stage at least one new DHCT to the system operator’s specifications.  
5  After staging, did the DHCT successfully load the current client release 
software? 
 
If yes, go to step 6. 
 
If no, call Cisco Services for assistance.