Cisco Cisco StadiumVision Mobile Reporter 安装指南
© 2011 Cisco Systems, Inc. All rights reserved
Page 17 of 71
Chapter 3 Installation
To achieve system redundancy for the SV Director Server, the hardware
requirements are as follows:
requirements are as follows:
Dual Power Supply Units (PSUs)
Dual CPU 2.33 GHz
Dual 2 GB RAM (total of 4 GB)
Dual 147 GB hard disk drive (configured as RAID-1)
To install the SV Director Server, you will need to do the following:
Removing the Chassis Cover
Warning! Before performing any of the following procedures, ensure that power
is removed from the DC circuit. Statement 1003
is removed from the DC circuit. Statement 1003
Warning!
Before working on a chassis or working near power supplies, unplug
the power cord on AC units. Statement 246
Note:
A nonskid surface or a stop behind the appliance may be needed to
prevent the unit from sliding on your work surface.
To remove the cover:
2. If already powered on, power down the unit and all external devices.
Disconnect the AC power cord or DC power source and all external cables.
3. Attach the antistatic wrist strap to your wrist and connect its cord to the ESD
socket on the top, left-hand side on the front of the appliance.
4. Remove the shipping screw, if present.
5. While pushing in and holding the blue button at the top of the chassis (see
location 1 in Figure 14), slide the top cover back until it stops.