Laser Link Mini-Mainframe Electrical Connections,
 Continued 
Power Distribution Board 
The power distribution board routes status and powering signals to and from the 
housed modules. It is located on the rear of the product. 
 
 
 
Procedure 
Follow these steps to install power supply B. 
 
1. 
Physically secure the alternate (redundant) power supply in a suitable 
location near the Mini-Mainframe. 
2. 
Connect the power supply B interface cable to J1 on the power distribution 
board. 
3. 
Connect the four wires on the opposite end of the power interface cable to 
power supply B as follows: 
• 
+24 V DC to J1-1 and J1-2 
• 
Ground leads to J1-3 and J1-4 
4. 
Continue to Chapter 3, Setup and Operation