Cisco Cisco Prime Collaboration Assurance 11.5 白皮書
© 2014 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information.
Page 36 of 40
Node-to-Node Test Events
The events are raised on the source device. A threshold event is generated when the threshold violation occurs for
three consecutive polling cycles. The event is cleared if the value falls below the threshold in the following polling
cycle.
The following node-to-node events can be generated:
●
NodeToNodeTestFailed
●
RoundTripResponseTime_ThresholdExceeded
●
RingBackResponseTime_ThresholdExceeded
●
RegistrationResponseTime_ThresholdExceeded
●
AverageLatency_ThresholdExceeded
●
PacketLossSD_ThresholdExceeded
●
PacketLossDS_ThresholdExceeded
Batch Tests
Batch tests help enable you to test the health and connectivity of a branch office. Batch tests consist of a set of
synthetic tests that are run on voice applications (for instance, Cisco Unified Communications Manager Express or
Cisco Unity Express) that are deployed in a branch office and a set of phone tests that are run on real phones in
the branch office. Batch tests can be run on demand for troubleshooting purposes or on a scheduled basis to verify
the health of the voice network in the branch office.
The batch test import file is an XML file. You can find the template of an import file in the /opt/CSCOpx/ImportFiles
folder. You need to use SFTP as the root user to the Cisco Prime Collaboration Assurance server. The SFTP port
is port 26. You should create your own XML file by modifying the template file batchtest.xml, and then create the
batch test by importing your XML file (Diagnostics > Batch Tests > Create).
If you encounter an error message similar to “The batch test import file has fatal errors” please correct the import
file and import again, and verify that your seed file is formatted correctly.
Cisco Prime Collaboration Assurance saves the data collected by the batch tests to disk. Batch test data is stored
on the Cisco Prime Collaboration Assurance server in the following location: /opt/CSCOpx\data\bt.
Understanding Phone Tests
The phone tests that are run as part of batch testing take control of a real phone in the network and make a call
from that phone to another phone. Phone tests use JTAPI credentials. These credentials must be included in the
batch test import file.
Table 5 describes the different phone tests that are used in batch testing.
Table 5.
Phone Test Descriptions - Batch Tests
Test
Description
Call
Takes control of a phone and places a call to a given number. The call can be from a real phone to a number, in which
case the test is controlling the caller only. Alternatively, the call can be from a real phone to a real phone, in which case
the test is controlling both the caller and the receiver.
case the test is controlling the caller only. Alternatively, the call can be from a real phone to a real phone, in which case
the test is controlling both the caller and the receiver.
Call Hold
Takes control of two phones and performs the following:
● Places a call from phone A to phone B.
● Has phone B put the call on hold.
● Disconnects the call.
● Has phone B put the call on hold.
● Disconnects the call.