VCU Unit Installation and Provisioning 
LTE 700 MHz MobileAccessVE Instant Coverage Solution User Manual 
20
 
Connect the relevant alarms according to the connector pinout below.  
 
 
 
Table 9. Alarms Connector 
– used pins 
  8 – Major Error Signal (Normally closed) 
  7 – Minor Error Signal (Normally open) 
11 – Major COM  
12 – Minor COM 
15 –Major Error Signal (Normally open) 
13 – Minor Error Signal (Normally closed) 
4.2.2 
Slave VCU Installation 
1.  Install  the  Slave  VE  Control  Unit  (VCU)  in  the  IDF/Telco  closet  corresponding  to  the  floor 
being covered. The Slave VCU can be installed in the rack using the supplied bracket. Apply 
power to the Slave VCUs and note that the VCU PWR LED is lit. Note that the unit ACT LED 
completes initialization (solid light) and shows a blinking green light. See Figure 4-1. 
 
 
 
   
 
Figure 4-1. VCU PWR, RF and Master LEDs 
2.  Connect the Slave VCU front panel Master port to the Master VCU VAP port via the patch 
panel  using  dedicated  CAT-6  cables.  Verify  that  the  Master  LED  completes  initialization 
(blinking light) and shows a solid green light. The (RF) MIMO LEDs (of both services) should 
turn OFF.  
11 
15 
Major Alarm 
12 
13 
Minor Alarm 
PWR LED 
 
 
Master LED 
 
RF Source LEDs  
(One per service)