Mobilicom ltd. MCU-30 用户手册
MCU-30 User Manual
Page : 24 / 51
This page contains information which is protected by copyright and is proprietary to Mobilicom Ltd.
No part of this document
may be used, copied, disclosed or conveyed to another party without prior written consent of Mobilicom Ltd
8.1 Mobile PTP Link Step-by-Step
Configuration
In order to build a Mobile PTP link, 2 MCUs are required. One MCU acts as a VC,
while the other as a Node.
while the other as a Node.
1. Connect antennas to RF1 and RF2 connectors, and power up the MCU.
CAUTION – Powering up an MCU unit without connecting the
antennas can cause unrepairable damage to it.
antennas can cause unrepairable damage to it.
2. Connect the MCU to a PC using a standard Ethernet Cat 5 cable.
3. Set static IP in the 192.168.131.xxx subnet. (for more information see MC-
3. Set static IP in the 192.168.131.xxx subnet. (for more information see MC-
EMA P2P User Manual).
4. Using the MC-EMA: connect to the MCU (VC or Node, by default. The MCUs
are shipped with a Mobile PTP SW and are set as a VC). From the MC-EMA,
connect to screen choose the unit and click on the “Connect” button.
connect to screen choose the unit and click on the “Connect” button.
Figure 8: MC-EMA-PTP connect to screen
5. From the MC-EMA main menu (on the left side) choose the configuration
screen and set the MCU to VC (if needed)
by choosing the VC “radio button”
than click on the “Set Mode” button – the unit will reboot
6. Change the frequency to the required frequency
and click on the “Set
Frequency” button – the unit will reboot
7. Set the profile as required (RF bandwidth, bitrate and ratio)
click on the “Set”
button
“- the unit will reboot
8. Repeat stages 1-4 with the 2
nd
unit.
9. Go to configuration screen and set the MCU to Node (if needed)
– the unit will
reboot.
10. Repeat stages 6-7 with the 2
nd
unit.