5. Locate the position of the antenna assembly. The location will be on the bottom of
the cabs. The antenna cable has a very low voltage (approximately 50 millivolts
max.). Use conduit if required by code.
max.). Use conduit if required by code.
Elevator 1
Elevator 2
Access
Point
Hoist way
Antenna
Hoist way
Antenna
Cab
bottom
Antenna
Cab
bottom
Antenna
Elevator 3
Cab
bottom
Antenna
Elevator 5
Elevator 6
Access
Point
Hoist way
Antenna
Hoist way
Antenna
Cab
bottom
Antenna
Cab
bottom
Antenna
6. Each hoist way will require the attachment and wiring of 2 antennas to the wall in
the pit. The estimated time to perform the pit work is 2 hours. The location will be
close to the holes that were drilled into the hoist way from the electrical boxes for
the Access Points. (Note: Access Points require 2 antennas regardless of the
number of elevator cars serviced in the hoistway.) The Antennas are typically
mounted with line of site to the cab bottom and either side of the center cab in the
hoist way. For the two cab hoist way they will be set up with 1 over the center of
close to the holes that were drilled into the hoist way from the electrical boxes for
the Access Points. (Note: Access Points require 2 antennas regardless of the
number of elevator cars serviced in the hoistway.) The Antennas are typically
mounted with line of site to the cab bottom and either side of the center cab in the
hoist way. For the two cab hoist way they will be set up with 1 over the center of