6 Installing an RHUB 
 
Issue 08 (2016-05-30) 
Huawei Proprietary and Confidential         
Copyright © Huawei Technologies Co., Ltd. 
23 
 
Requirements for the Upper-level Circuit Breaker 
Type C upper-level AC circuit breakers or slow-blow fuses must be used for power cables. 
The maximum current must not exceed 16 A. Table 6-2 describes the recommended 
specifications. 
Table 6-2
 Circuit breaker specifications for power cables 
Power Supply 
Upper-level AC Circuit 
Breaker (For a single 
RHUB) 
Cross-Sectional Area of 
the Input Power Cable 
220 V AC single-phase 
≥ 6 A 
1.5 mm
2
 
110 V AC dual-live-wire 
110 V AC single-phase 
≥ 12 A 
 
6.2 Installation Process 
The RHUB installation involves installing an RHUB module, installing RHUB cables, 
checking the RHUB hardware installation, and powering on the RHUB.     
Figure 6-12 shows the RHUB installation process.