Huawei Technologies Co. Ltd PRU11WIFI 用户手册

下载
页码 303
DBS3900 LampSite 
Installation Guide 
6 Installing an RHUB 
 
Issue 08 (2016-05-30) 
Huawei Proprietary and Confidential         
Copyright © Huawei Technologies Co., Ltd. 
53 
 
----End 
Follow-up Procedure 
1. 
Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 
Requirements for Cable Layout. 
2. 
Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 
6.4.8 Installing Alarm Cable (Optional) 
An RHUB alarm cable transmits dry node alarm signals.   
Prerequisites 
Connectors for an alarm cable are prepared.   
Context 
Figure 6-40 shows the exterior of an RHUB alarm cable. 6.4.2 Cable List shows the 
installation position on both ends of the RHUB cable.   
Figure 6-40
 RHUB alarm cable 
 
 
Procedure 
Step 1  Connect the RJ45 connector on one end of the alarm cable to the EXT_ALM port on the 
RHUB.   
Step 2  Connect the other end of the alarm cable to the alarm cable port on the device to be 
monitored.   
----End 
Follow-up Procedure 
1. 
Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 
Requirements for Cable Layout. 
2. 
Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 
6.4.9 Installing Power Cable 
The RHUB power cable provides 110 V AC/220 V AC power supply for the RHUB.