Honeywell International Inc. 6510GP 用户手册

下载
页码 84
 
 
 
 
 
2.  Slide the bolt through the wall bracket, and thread the toggle nut onto 
the bolt. 
3.  Press the ends of the toggle nut together, and insert the bolt/nut into the 
pilot hole until the nut clears inside wall surface. The toggle nut should 
spring open preventing the screw from being removed. 
4.  Repeat steps 2 and 3 for each of the remaining mounting holes. 
 
5.  Tighten all four bolts to secure the bracket to the wall. 
6.  Once the bracket is installed, secure the base to the wall bracket, see 
for detailed instructions. 
Wood Stud Installation 
1.  Drill four pilot holes in the wall/wood stud using the 1/4 in. drill bit. 
 
 
Bolt 
 
 
 
Bracket 
 
 
 
Wall 
 
 
 
 
Bracket 
Toggle Nut 
 
 
 
 
 
 
Wall 
 
 
Open 
Toggle Nut 
2.  Secure the bracket to the wall using the four Hex Head Lag Screws provided. 
3.  Once the bracket is installed, secure the base to the wall bracket, 
for detailed instructions. 
Securing the Base to the Wall Bracket 
You can secure the base to the wall bracket using the optional DIN rail. 
 
Hardware Required 
•  DIN Rail, Qty. 1 
•  3/16 in. dia x 5/8 in. long pan head screw, Qty. 2 
•  1/2 in. OD x 7/32 in. ID x 3/64 in. thick washer, Qty. 2 
•  3/16 in. dia nut, Qty. 2 
 
1.  Position the DIN Rail on the wall bracket, as shown below. 
2.  Slide the screw through the slot on the DIN Rail and the mounting hole in the bracket.