Roseman Engineering Ltd. FG3E 用户手册

下载
页码 44
 
 
Fleet Gate Installation Guide                                                                                    Roseman Engineering Ltd
 
 
  
 
 
The Fueling Division of Roseman Engineering Ltd.  
                                                              
 
 
1.4   Required Tools 
 The following tools are required to complete the installation procedures: 
  Screwdrivers 
  Box wrenches 
  Crimping tool 
  Wire stripping tool 
  Drill with a 1/8" drill bit 
  Heat gun (for heat-shrink insulation) 
1.5 Required Materials 
The following materials are required to complete the installation procedures: 
  Two conductor twisted pair (with foil shield and drain wire) cable (18 
gauge min) 
  Wire terminals. Do not use Scotch Locks. 
  3/8" inch self-tapping, sheet metal screws (Rittal SZ2487 or equivalent) 
with matching flat washers and split washers 
  Grommets 
  Three amp fuse and fuse holder 
1.6 Wiring Instructions 
 The general procedures for wiring the FG3 as follows: 
  Using a wire stripping tool, remove insulation to bare 3/8" of wire. 
  Press firmly on the connector locking tab. 
  Insert the exposed wire end. 
  Release the locking tab. 
  Check to make certain the wire is held firmly in place and that the wire 
insulation is not pinched in the terminal. 
 
 
 
 Use gasoline and oil-resistant wiring only. Route wires away 
from moving parts and the vehicle’s exhaust system.