3.4.6 
Connect the T1 Network 
Connect the high-speed digital T1 (telephone) network Interface to the Site Access Server 
as defined by the Site Deployment Order. 
NOTE
 
In most installations, this connection goes to microwave equipment. 
3.4.7 
Site Clean Up 
Before leaving, remove any debris, such as wire clippings, metal shavings, dust mounds, 
etc. from the site. 
3.5 COMPLETING 
THE 
INSTALLATION 
Once the OpenSky equipment has been installed, perform field testing as detailed in 
Section 4.0 SITE TEST PROCEDURES to verify operation according to specifications of 
installed equipment racks with externally connected subsystems such as antennas. 
Procedures: 
1.  Perform testing to verify correct operation and performance of the installed 
equipment racks, following the procedures specified in Section 4.0 SITE TEST 
PROCEDURES. 
2.  Set HPA transmission power level, following the procedure specified in Section 
7.06.7 -TX POWER CALIBRATION (MANDATORY). 
3.  If problems occur during installation, describe them and detail how they were 
resolved. If the installation could not be completed, describe the obstacles and clearly 
explain what was done and what remains to be done.