Cisco CEE 7/7 - IEC-C19 13-ft Europe CAB-CEE77-C19-EU= 用户手册

产品代码
CAB-CEE77-C19-EU=
下载
页码 16
   
2-16
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 2      Preparing for Installation
Site-Planning Checklist
Table 2-6
Site-Planning Checklist
Task No.
Planning Activity 
Verified by
Time
Date
1
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
3
Power evaluation:
Input power type
Receptacle proximity to the equipment
Dedicated (separate) circuits for redundant 
power supplies
UPS for power failures
4
Grounding evaluation:
Circuit breaker size
5
Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6
EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels