Burnham C Series 规格说明表单
*8. Unit(s) shall be equipped with a Model _______ built-in tankless heater coil installed in the water space
at the front of the boiler, with the capacity to heat _______ GPH of domestic water from 40F to 140F with
boiler water at ____F.
Fuel Burning Equipment:
The burner(s) shall incorporate all necessary devices and controls to make a complete fuel burning system
for the type of fuel specified herein, and bear the listing label of UL evidencing compliance with
requirements of UL-296 for oil burners, and/or UL-795 for gas burners.
*9a. Oil burners for #2 oil shall be of the forced-draft pressure atomizing type, complete with integral motor
driven blower, oil pump, oil nozzle(s) oil solenoid valve(s), ignition assembly, combustion safeguard, motor
starters, and all necessary controls for safe and efficient operation in accordance with UL requirements (and
FM requirements)(and IRI requirements).
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
*9b. Gas burners shall be of the forced draft multi-jet type suitable for burning ______ gas with heat
content of ________ BTU per cubic foot and specific gravity of _____ delivered to the gas train inlet at a
pressure of ( ________ inches w.c)( _______ psig). Burner shall be complete with integral motor driven
blower, ignition assembly, combustion flame safeguard, motor starter, complete gas train, including gas
pressure regulator and dual gas valves, and all necessary controls for safe and efficient operation in
accordance with UL requirements (and FM requirements)(and IRI requirements).
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
*9c. Combination gas/oil burner shall consist of an integral assembly of a forced-draft pressure atomizing
oil burner suitable for burning #2 oil and a forced draft multi-jet type gas burner suitable for burning _____
gas with a heat content of _____ btu per cubic foot and specific gravity of _____ delivered to the gas train
inlet at a pressure of ( ______ inches w.c.)( ______ psig). Burner shall be complete with integral motor
driven blower, ignition assembly, combustion flame safeguard, motor starter, complete gas train, including
gas pressure regulator and dual gas valves, oil pump, oil nozzle(s) oil solenoid valve(s), ignition assembly,
combustion safeguard, motor starters, and all necessary controls for safe and efficient operation in
accordance with UL requirements (and FM requirements)(and IRI requirements). Changeover to either fuel
shall be by means of manual selector switch which shall energize only those circuits necessary to provide
the appropriate timing and sequence of events for the fuel selected, except that the oil pump may continue
to operate when firing gas. No burner adjustments or re-positioning of control linkage shall be required
when changing from one fuel to an alternate fuel.
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
10. Electrical supply to the boiler(s) will be _____ volts ______ hz _______ phase. All control circuits
shall be 120 volts, 60 hz, 1 phase with all switches in the ungrounded leg. Fuse protection for the control
circuit shall be provided.
at the front of the boiler, with the capacity to heat _______ GPH of domestic water from 40F to 140F with
boiler water at ____F.
Fuel Burning Equipment:
The burner(s) shall incorporate all necessary devices and controls to make a complete fuel burning system
for the type of fuel specified herein, and bear the listing label of UL evidencing compliance with
requirements of UL-296 for oil burners, and/or UL-795 for gas burners.
*9a. Oil burners for #2 oil shall be of the forced-draft pressure atomizing type, complete with integral motor
driven blower, oil pump, oil nozzle(s) oil solenoid valve(s), ignition assembly, combustion safeguard, motor
starters, and all necessary controls for safe and efficient operation in accordance with UL requirements (and
FM requirements)(and IRI requirements).
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
*9b. Gas burners shall be of the forced draft multi-jet type suitable for burning ______ gas with heat
content of ________ BTU per cubic foot and specific gravity of _____ delivered to the gas train inlet at a
pressure of ( ________ inches w.c)( _______ psig). Burner shall be complete with integral motor driven
blower, ignition assembly, combustion flame safeguard, motor starter, complete gas train, including gas
pressure regulator and dual gas valves, and all necessary controls for safe and efficient operation in
accordance with UL requirements (and FM requirements)(and IRI requirements).
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
*9c. Combination gas/oil burner shall consist of an integral assembly of a forced-draft pressure atomizing
oil burner suitable for burning #2 oil and a forced draft multi-jet type gas burner suitable for burning _____
gas with a heat content of _____ btu per cubic foot and specific gravity of _____ delivered to the gas train
inlet at a pressure of ( ______ inches w.c.)( ______ psig). Burner shall be complete with integral motor
driven blower, ignition assembly, combustion flame safeguard, motor starter, complete gas train, including
gas pressure regulator and dual gas valves, oil pump, oil nozzle(s) oil solenoid valve(s), ignition assembly,
combustion safeguard, motor starters, and all necessary controls for safe and efficient operation in
accordance with UL requirements (and FM requirements)(and IRI requirements). Changeover to either fuel
shall be by means of manual selector switch which shall energize only those circuits necessary to provide
the appropriate timing and sequence of events for the fuel selected, except that the oil pump may continue
to operate when firing gas. No burner adjustments or re-positioning of control linkage shall be required
when changing from one fuel to an alternate fuel.
Note: Insert additional details such as desired combustion safeguard, firing sequence, and/or other features
to meet project specifications.
10. Electrical supply to the boiler(s) will be _____ volts ______ hz _______ phase. All control circuits
shall be 120 volts, 60 hz, 1 phase with all switches in the ungrounded leg. Fuse protection for the control
circuit shall be provided.
Burnham Commercial
Lancaster, PA
11/04