Utica Boilers SSV 安装指导

下载
页码 88
71
1.4 Sequence of Operation
Operational State
User Interface Display
Explanation
Boiler operates in standby mode 
until demand for Central Heat (CH) 
or Domestic Hot Water (DHW) is 
detected.
CH or DHW pump is turned on based 
on type of heating demand.
(CH call is illustrated) 
Control Module compares supply  
Temperature to set point. Boiler 
proceeds to ignition if supply 
temperature is less than set point. 
Combustion Air Blower speed             
modulates to pre-purge setting for 15 
seconds.
Sparking initiated sequence.
Heat     
Demand?
DHW CH 
Pump on
Supply 
Temperature 
<Setpoint?
15 Second 
Prepurge
Ignition 
Sparking
No
Yes
No
Yes
After 2 seconds
APPENDIX A - CONTROL MODULE