GSI Outdoors Commercial Direct Gear Drive Bin Sweep Auger PNEG-1521 用户手册

下载
页码 64
INSTALLATION
16
PNEG-1521     Commercial Direct Gear Drive Bin Sweep Auger
4. UNLOAD TUBE ASSEMBLY INSTALLATION
(Cont.)
5/16” Serrated
Flange Nuts
Connecting Band
5/16” x 1 -1/2”
Hex Bolts
E. Position the Unload Tube flush against the
Centerwell tube.
Unload Tube
Centerwell Tube
F.
Slide the Connecting Band until it is equally
positioned over both the Unload Tube and the
Centerwell tube. Position the Connecting Band so
that it will not interfere with the control rods.
G. Secure the Connecting Band with three
(3) 5/16" x 1-½” Hex bolts and Serrated Flange
nuts, making sure the Intermediate  Wells are
level with the Centerwell.
FIG. 4-C
FIG. 4-D