GSI Outdoors Commercial Direct Gear Drive Bin Sweep Auger PNEG-1521 用户手册
INSTALLATION
18
PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger
E. Thread the 1” External Control Pipe Coupler onto
the Intermediate Control Rod. Also thread the ½”
Internal Control Pipe Coupler onto the Centerwell
Control Rod.
Internal Control Pipe Coupler onto the Centerwell
Control Rod.
5. OUTER UNLOAD TUBE ASSEMBLY INSTALLATION
(Cont.)
CENTER OF BIN
Inside Intermediate
Control Rod
1” External Control
Pipe Coupler
1/2” Internal Control
Pipe Coupler
Centerwell
Control Rod
Centerwell Control Rods
Inside Intermediate
Control Rods
FIG. 5-D
CENTER OF BIN
FIG. 5-E
F.
Thread the other Centerwell Rod onto the ½”
coupler and leave it slightly loose. Also thread the
other Intermediate Rod onto the 1” coupler.
coupler and leave it slightly loose. Also thread the
other Intermediate Rod onto the 1” coupler.