GSI Outdoors Commercial Direct Gear Drive Bin Sweep Auger PNEG-1521 用户手册

下载
页码 64
INSTALLATION
29
PNEG-1521     Commercial Direct Gear Drive Bin Sweep Auger
F.
Align the next section of Sweep Flight making sure
that the Dura-Edge on both Flights are as
continuous as possible, the angle between both
faces being greater than 90°, and less than 180°,
and without overlapping.
11.  INSTALLING THE SWEEP FLIGHTING
(Cont.)
J.
Attach the Shield Pivot Bracket to the Gearbox
Pivot Bracket using a 5/8" x 1-½” Hex bolt and
Nylock nut.
G. Install the next section of Sweep Flight.  Bolt it to
the Connecting Shaft using two (2) 5/8" x 4" Grade
8 bolts and Stover nuts.
H. Repeat Steps D - G for additional sections of
Sweep Flight.
I.
Attach the Gearbox Pivot Bracket onto the
Gearbox with four (4) ½” x 1-¼” Flange bolts and
flat washers.
Overlapping the Flights, or
having an angle between the
ribbon faces be  less than 90° or
greater than 180°, will result in
reduced unload capacity.
5/8” x 4” Hex Bolt
5/8” Stover Nut
Gearbox Pivot
Bracket
Flat Washers
1/2” x 1-1/4”
Flange Bolts
5/8” x 1-1/2”
Hex Bolt
5/8” Nylock Nut
Shield Pivot Bracket
FIG. 11-F
FIG. 11-G
FIG. 11-H