Spectrum Brands MC.31XX 用户手册

下载
页码 102
Hardware Installation
Installing the board in the system
(c) Spectrum GmbH
17
Installing multiple synchronized boards
Hooking up the boards
Before mounting several synchronized boards for a multi 
channel system into the chassis you have to hook up the 
boards with their syncronization cables first. Spectrum 
ships the boards together with the needed synchronization 
cable.
All of the possible four boards must be wired with deliv-
ered synchronization cable. The figure is showing that ex-
emplarily for three synchronized boards. As you can see, 
all boards have a notch to get the cables from one board 
to the other. Please take care that the cable lays within 
these notches to avoid damages to the cable when insert-
ing the boards into the host system.
The outer boards have a soldered termination for the sync 
bus. These boards are marked with an additional sticker.
Only mount the cluster of synchronized boards 
in a row with the dedicated boards on the outer 
sides.
Mounting the wired boards
The locks on the top and bottom side of all CompactPCI brackets need to be unlocked and opened before installing the boards into the slots 
of the system. Therefore you need to press the little buttons on the inside of the fasteners and move them outwards (see figure). Now slowly 
insert the boards into the host system using the key ways until both locks snap in with a „click“.
While inserting the boards take care not to cant them and make sure that the cable is not squeezed by the 
backplane or any other components.
After the board’s insertion fasten the screws of all brackets carefully, without overdoing. The figure shows exemplarily a board with two in-
stalled modules.