12
RIDGE
2’ (.61 M) MIN.
MORE THAN 10’ (3.1 M)
10’ (3.1 M)
HEIGHT ABOVE ANY 
ROOF SURFACE WITHIN 
10’ (3.1 M)
HORIZONTALLY
CHIMNEY 3’ (.92 M)
GAS VENT OR
TYPE  L  VENT 
2’ (.61 M) MIN.
If oil fired water heater is vented into same flue as boiler, 
provide separate hole into chimney whenever possible. 
When this isn’t possible, use “Y” connection in flue pipe, 
using separate draft regulator for each unit. 
When chimney does not provide adequate draft to handle 
input from water heater and boiler simultaneously, wire 
units so only one will operate at a time, favoring water 
heater.
• Inspect chimney to make certain it is constructed 
according to the latest revision of the NFPA 211. Local 
regulations may differ from this code and should be 
checked. Where there is a conflict, the local code will 
prevail.
• Install boiler into chimney having a masonry or metallic 
chimney liner.
• Unlined chimney will have leaks that will cause poor 
chimney performance (no draft), and could result in 
positive pressure in the combustion chamber.
• Horizontal portions of venting system should not 
exceed 10 feet in length. Horizontal lengths over 10 ft. 
will have a negative effect on  chimney performance.
• Extend chimney at least 2 ft. above any portion of 
building within 10 ft.  Producing a -.02 inch W.C. draft 
in the combustion chamber. See Figure #11.
• See Ratings Table page 3 for recommended minimum 
chimney or vent sizes. 
• Inadequate draft causes improper combustion, 
resulting in dirty flue ways and high fuel bills.
• Connect flue pipe same size as boiler outlet to chimney, 
sloping upward continuously toward the chimney 
approximately ¼" per foot. Bolt or screw joints 
together to avoid sag.
Figure #11
VENTING SYSTEM INSPECTION & INSTALLATION
WARNING
Boiler is to be vented by natural draft and shall not 
be connected into any portion of mechanical draft 
operating system under positive pressure.
!