4 - INSTALLATION PROCEDURE
Table 3 - MINIMUM CLEARANCE DIMENSIONS
Inches
(mm)
Top
6”
(152mm)
Rear
6”
(152mm)
Control Side
7”
(178mm)
Opposite Side
6”
(152mm)
Front
18”
(457mm)
Flue/Vent Connector
6”
(152mm)
Near Boiler Piping
2”
(51mm)
WARNING
Improper installation, adjustment, alteration, 
service or maintenance could result in death or 
serious injury
.
!
   
WARNING
Fire hazard. Do not install boiler on 
combustible flooring or carpeting. Failure to 
follow these instructions could result in death 
or serious injury.
!
   
1. 
FOR INSTALLATION ON NON-COMBUSTIBLE 
FLOORS ONLY - For installation on combustible 
flooring special base must be used. (See 
Replacement Parts Section.) Boiler can not be 
installed on carpeting. 
NOTE: Greater clearances for access should supersede fire 
protection clearances.
* Definition of Alcove is three sided space with no 
wall in front of boiler. ANSI standard for alcove is 18 
inches from front of appliance to leading edge of side 
walls as shown below.
1. 
Installation must conform to the requirements 
of the authority having jurisdiction or, in the 
absence of such requirements, to the National 
Fuel Gas Code, ANSI Z223.1/NFPA 54.
2. 
Where required by the authority having 
jurisdiction, the installation must conform to the 
Standard for Controls and Safety Devices for 
Automatically fired Boilers, ANSI/ASME CSD-1.
3. 
Boiler series is classified as a Category I.  Vent 
installation shall be in accordance with "Venting of 
Equipment ," of the National Fuel Gas Code, ANSI 
Z223.1/NFPA 54 or applicable provisions of the 
local building codes. 
4. 
Boiler has met safe lighting and other 
performance criteria with the gas manifold and 
control assembly on the boiler per the latest 
revision of ANSI Z21.13/CGA 4.9.
5. 
Install boiler such that gas ignition system 
components are protected from water (dripping, 
spraying, rain, etc.) during appliance operation 
and service, (circulator replacement, condensate 
trap, control replacement, etc.).
6. 
Locate boiler on level, solid base as near chimney 
as possible and centrally located with respect to 
heat distribution system as practical.
7. 
Allow 24 inches (610mm ) at front and right side 
for servicing and cleaning. 
8. 
When installed in utility room, door should be 
wide enough to allow largest boiler part to enter, 
or to permit replacement of another appliance 
such as water heater.
Minimum Clearances to Combustible 
Construction (as seen from above)
6"
BOILER
18"
6"
Front
7"
Control 
Side