Safety Information
IMPORTANT: Read the following instructions 
COMPLETELY before installing!!
 WARNING
Fire, explosion, asphyxiation and electrical shock 
hazard.  Improper installation could result in death 
or serious injury.  Read this manual and understand 
all requirements before beginning installation.
!
  
 WARNING
Keep boiler area clear and free from combustible 
materials, gasoline and other flammable vapors 
and liquids.
DO NOT obstruct air openings to the boiler room.
Modification, substitution or elimination of factory 
equipped, supplied or specified components may 
result in personal injury or loss of life.
TO THE OWNER - Installation and service of this 
boiler must be performed by a qualified installer.
TO THE INSTALLER - Leave all instructions with 
boiler for future reference.
When this product is installed in the 
Commonwealth of Massachusetts the installation 
must be performed by a Licensed Plumber or 
Licensed Gas Fitter.
!
  
1. 
Never test for leaks with an open flame. Use soap suds 
to check all connections. This will avoid any possibility 
of fire or explosion.
2. 
Boiler is configured for operation with natural gas. 
Over-firing will result in premature failure of boiler 
sections and cause dangerous operation. Verify there is 
adequate gas supply piping. 
3. 
Never vent this boiler into enclosed space. Always 
connect boiler to chimney and vent to outside. Never 
vent to another room or inside abuilding.
4. 
Verify there is adequate air supply for complete  
combustion.
5. 
Follow regular service and maintenance schedule  for 
efficient and safe operation.
WARNING
Fire hazard. Do not install boiler on non-combustible 
flooring such as carpeting or wood flooring. Failure 
to follow these instructions could result in death or 
serious injury.
!
   
6. 
DO NOT install boiler on  non-combustible flooring such 
as carpeting or wood flooring.
Codes Governing Installation
 
Installation must conform to the requirements of the 
authority having jurisdiction or, in the absence of 
such requirements, to the National Fuel Gas Code, 
ANSI Z223.1/NFPA54.
Where required by the authority having jurisdiction, the 
installation must conform to the standard for Controls 
and Safety Devices for Automatically Fired Boilers, 
ANSI/ASME CSD-1. Additional controls and safety 
devices are required for CSD-1.
Installation
Boiler is designed to provide wide heating capacity range 
with multiple burner modules, each equipped with its own 
set of controls. For purposes of orientation, gas manifold 
location is considered the front. Instructions are written 
for assembly of boiler starting with left side and working to 
right side.
When Your Boiler Arrives
When boiler arrives be sure to save and refer to 
instructions.
Inspect each item received for visible damage. If any 
parts are damaged, report this to freight company 
immediately and request them to call and make 
inspection before you make any installation. Have 
inspector prepare a signed report. Send copy of 
report to manufacturer.
We must have the signed inspection report of the 
freight company to prove their liability.
Read these instructions carefully before beginning 
the installation to be sure all packages have been 
received. It is recommended that you follow the 
step-by-step instructions for best assembly results. 
Before discarding any packing material carefully 
examine for loose parts. Also store all parts received 
where they will not be lost or damaged.
SAFETY INFORMATION