Cabletron Systems SPECTRUM SEHI100TX-22 用户手册

下载
页码 88
Chapter 4: Installation
4-6
SEHI100TX User’s Guide
3. Ensure that the rack used will support the unit, and that the rack will 
remain stable with the unit installed in it. Support the SEHI securely 
from underneath, and align the mounting brackets of the SEHI chassis 
with the screw holes in the equipment rack as shown in Figure 4-5. 
Fasten the SEHI to the equipment rack securely.
Figure 4-5
Installing the SEHI in the Rack
!
CAUTION
The cooling fans at the rear panel of the SEHI must have 
adequate clearance (two inches on either side and in the 
rear
) for unrestricted air flow. The temperature for the selected 
location must be maintained between 5
°
C and 40
°
C, and 
fluctuate less than 10
°
C per hour.
PWR
CPU
CLN
HubSTACK 
100BASE-TX HUB 
WITH
 LANVIEW®
SEHI
100TX-
22
22X     21X     20X     19X     18X    17X
11X     10X      9X       8X       7X      6X
   16X     15X     14X     13X    12X
     5X       4X        3X        2X       1X
E
1
A
RCV
LNK
RCV
LNK
   22 21 20 19 18 17 16 15 14 13 12
    11  10  9  8  7   6   5   4   3   2   1
EPIM
  
1
Screws (4)
19-Inch Rack
1511_06