Cabletron Systems SPECTRUM SEHI100TX-22 用户手册

下载
页码 88
Chapter 4: Installation
4-8
SEHI100TX User’s Guide
3. Power up the SEH above the SEHI in the stack by plugging the power 
cord into the back panel of the SEH and plugging the other end into a 
grounded receptacle.
4. Verify that the PWR LED is on, indicating that the SEH is receiving 
power.
5. Attach the HubSTACK Interconnect cable provided with the SEH to 
6. Attach the other end of the interconnect cable to the “OUT” port on the 
rear panel of the hub at the bottom of the stack.
7. Repeat steps 3 through 6 until all SEH hubs are connected.
Figure 4-6
Stacking the SEHI
!
CAUTION
Do NOT connect the interconnect cable between the SEH and 
the SEHI before powering up the SEH. Otherwise damage to 
the SEH may result.
!
CAUTION
Do not leave an interconnect cable connected at only one end 
during network operation. Corrupted data may result.
100BASE-TX HubSTACK
Interconnect Cable
                       REAR VIEW
SEHI Managing 4 SEH Non-Intelligent Hubs
OUT
SEHI100TX INTERCONNECT
IN
SEHI
100TX
-22 
100BASE-TX HUB 
WITH
 LANVIEW®
OUT
SEH100TX INTERCONNECT
 IN
SEH
100TX
-22 
100BASE-TX HUB WITH LANVIEW®
OUT
SEH100TX INTERCONNECT
 IN
SEH
100TX
-22 
100BASE-TX HUB WITH LANVIEW®
OUT
SEH100TX INTERCONNECT
 IN
SEH
100TX
-22 
100BASE-TX HUB WITH LANVIEW®
OUT
SEH100TX INTERCONNECT
 IN
SEH
100TX
-22 
100BASE-TX HUB WITH LANVIEW®
1511_07