Bradford-White Corp B4 用户手册

下载
页码 32
Internet Version for Reference Only
 
BRADFORD WHITE
Page 4
Copper Brute B4 Volume Water Heaters
Page 5
HOT
HOT
a.      Remove the top filler plate, stamped “HOT”, by 
slipping a fine-blade screwdriver into the slot at 
the rear of the plate and gently prying it up (see 
Figure 2).
b.      Remove the two screws attaching the adapter 
plate to the top assembly and lift it out (see 
Figure 3).
c.      Remove the vent cap or drafthood from its 
package.
d.      Disengage the flue transition ring from the stack 
extension and place it on top of the collector 
assembly as shown in Figure 4.
SECTION 2.
Installation Instructions
2.1  General Information
 WARNING
Follow local regulations with respect to installation 
of carbon monoxide (CO) detectors and 
manufacturer's maintenance schedule of the heater.
Install the Copper Brute heaters in accordance 
with the procedures in this manual (or the warranty 
may be voided), local codes and ordinances. In the 
absence of such codes, install the heaters in accordance 
with the latest edition of the National Fuel Gas Code, 
ANSI Z223.1. In Canada, the installation must be 
in accordance with CAN1-B149.1 or .2 and local 
codes. The authority having jurisdiction may require 
the installation conform to the Standard for Controls 
and Safety Devices for Automatically Fired Heaters, 
ANSI/ASME CSD-1. Any changes to the heater, gas 
controls, gas orifices, wiring or draft diverter may void 
the warranty. If field conditions require a change to 
any of the above, consult the factory. 
All gas-fired products require correct installation 
to assure safe operation. The requirements for heaters 
include the following:
1.      Field assembly of drafthood or vent cap (see 
Section 2.2).
2.      Appropriate site location (clearances) and 
flooring.
3.      Sufficient combustion and ventilation air.
4.      Adequate venting of combustion products.
5.      Adequate water flow.
6.      Properly sized gas meter and piping.
7.      Proper electrical wiring.
This manual provides the information needed to 
meet these requirements. Review all application and 
installation procedures completely before continuing 
the installation. 
2.2  Field Assembly
The Copper Brute heater is shipped from the 
factory with the top assembly in the low-profile 
configuration for outdoor installations. 
The Copper Brute heater is design certified 
for indoor installation when equipped with a 
special drafthood, which must be installed without 
modification. The part number for the drafthood is on 
the heater rating plate. Follow this procedure to make 
the conversion:
Figure 2.  Top filler plate.        Figure 3.  Adapter plate.
Figure 4.  Flue transition        Figure 5.  Vent cap with
                 ring.                                          adapter plate  
                                                                   (outdoor).
Figure 6.  Drafthood with        Figure 7.  Drafthood switch
                 adapter plate                            receptacle.
                 (indoor).