Bil-Jax Bicycle Accessories et 4000 用户手册

下载
页码 18
SERVICE 
8 
 
Hydraulic Fluid Levels 
 
 
1.  Remove cover from hydraulic pump. Check 
fluid level in hydraulic reservoir. 
 
2.  Lower trailer deck. If oil level is below 3 inches 
with deck down, add 1/2 quart of hydraulic oil. 
Use BP type HLP-46 or 10w hydraulic oil.  
 
NOTE:  When trailer deck is raised, hydraulic 
fluid level should be at least 1/2 of reservoir 
volume. 
 
 
 
 
 
3.  Remove fill cap from surge brake reservoir. 
Add DOT 3 brake fluid as needed to bring 
fluid level to 1/2 inch below fill port. 
 
 
FILL CAP
 
 
 
Battery 
 
 
1.  Use hydrometer to check battery charge daily 
or weekly, depending on frequency of use. If 
the battery charge drops below 25% of full 
charge (S.G. below 1.155 as corrected to 
80°F) the battery must be recharged. Refer to 
step 2 before charging battery. 
 
2.  Check the electrolyte level weekly. If battery 
charge is low, add water to bring electrolyte 
level just above plates. 
 
If battery is fully charged, add water to raise 
electrolyte to full mark in each cell. 
3.  Charge battery at one of the following charge 
rates. The slow charge rate is preferred. 
22 hours @ 5 amps 
2
5 hours @ 20 amps 
2
2 hours @ 50 amps