Raritan Computer Paragon II 255-30-6000-00 用户手册
Tiered Configurations
138
2. Recycle the power of all impacted devices. This is recommended to
build a clean database for Paragon switches. Sequence of recycling
power is from the HIGHEST tier (third tier) to the Base Unit. In our
example: UMT‐3A Æ UMT‐2A Æ UMT‐2B Æ UMT‐2C Æ UMT‐ 1A
Æ UMT‐1B.
power is from the HIGHEST tier (third tier) to the Base Unit. In our
example: UMT‐3A Æ UMT‐2A Æ UMT‐2B Æ UMT‐2C Æ UMT‐ 1A
Æ UMT‐1B.
Example B: Relocating a second‐tier device with multiple base connections (refer
to blue line in the diagram):
to blue line in the diagram):
1. Disconnect some or all of the user ports on a tiered device (UMT‐2C)
that connect to the channel ports of a Base Unit (UMT‐1A) and
re‐connect those user ports to another Base Unit (UMT‐1B).
re‐connect those user ports to another Base Unit (UMT‐1B).
2. Recycle the power of impacted devices. This is recommended to
build a clean database for Paragon switches. Sequence of recycling
power is from the HIGHEST tier (second tier) to the Base Unit. In our
example: UMT‐2C Æ UMT‐1A Æ UMT‐1B.
power is from the HIGHEST tier (second tier) to the Base Unit. In our
example: UMT‐2C Æ UMT‐1A Æ UMT‐1B.
The operation is the same for tiered devices that are not Paragon
switches.
switches.
Red color
Example A
Blue color
Example B