Capital MWOV302ES 安装指导

下载
页码 16
 
- 7 - 
PLANNING THE INSTALLATION 
1.  Plan the intended installation location by verifying that sufficient cabinet size and clearances are 
available. 
2.  Check that electrical power is available or can be established at the installation location and that all local 
codes can be met. 
3.  To provide the optimal operation of your appliance, the oven should be installed in a location that will 
minimize drafts created by doors, windows, ventilation outlets, etc. 
4.  Check traffic paths to verify sufficient clearances for the oven doors when open and be aware of 
interference with walkways. 
5.  If installing under a countertop, verify there is sufficient clearance to the front and/or sides of the oven to 
load and unload large cooking vessels. 
Cabinet Cutout Diagrams: 
IMPORTANT:  The bottom platform of the cabinet must be constructed to support the weights as shown below: 
 
 
 
 
 
 
 
 
 
SINGLE OVEN COUNTER INSTALLATION