Hoshizaki SRH/3 KM-1400SWH-M 用户手册

下载
页码 101
17
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
1. "E" and "G" Control Board without Harvest Pump Timer Operation
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "W
A
SH" P
osition
The "W
A
SH" position on the contr
ol s
witch is used when cleaning and sanitizing the
 icemak
er
. W
hen in the "W
A
SH" 
position, po
w
er is supplied t
o the pump mot
or
. W
ith the cleaning v
al
ve closed, the cleaner and sanitiz
er fl
ow o
ver the 
outside of the e
vapor
at
or plat
e assemb
ly
. W
ith the cleaning v
al
ve open, the cleaner and sanitiz
er fl
ow o
ver both the 
outside and the inside of the e
vapor
at
or plat
e assemb
ly
Not
e:
 Close the cleaning v
al
ve af
ter cleaning and sanitizing ar
e complet
e, otherwise the icemak
er will not r
est
ar
t  
         when the contr
ol s
witch is placed in the "ICE" position.
Leg
end:
BC
–bin contr
ol
Comp
–compr
essor
FM
–f
an mot
or
FMR
–f
an mot
or
-r
emot
e
FS
–fl
oat s
witch
HGV
–hot g
as v
al
ve
 
L
LV
–liquid line v
al
ve
PM
–pump mot
or 
WV
–inlet w
at
er v
al
ve
• Max.
 WV time:
 6 min.
• Max.
 har
vest time:
 20 min.
FS
 chec
k
1 t
o 3-min.
 har
vest 
timer
 in contr
ol 
(S4 dip s
witch
 1 & 2)
"E" and "G" Contr
ol Boar
d without Har
vest P
ump 
Timer Oper
ation Flo
w Char
t
1.
 1
-Min
ut
e
  F
ill Cy
cle
Cy
cle 
St
eps
2.
 Har
vest Cy
cle
Ther
mist
or 
in contr
ol
3.
 F
reez
e Cy
cle
• Min.
 fr
eez
e time:
 5 min.
• Max.
 fr
eez
e time:
 fr
eez
e timer 
set
ting 
 (S4 dip s
witch 9 & 1
0)
FS
 in contr
ol 
4.
 P
ump-Out Cy
cle
• F
act
or
y set f
or e
ver
10th c
ycle 
 
 (S4 dip s
witch 5 & 6)
• P
ump mot
or st
ops f
or 
sec., then r
ev
er
ses 
for 1
0/20 sec.
 (S4 dip 
switch 3 & 4)
WV
 ener
giz
ed
FS
 open
Comp
 ener
giz
ed
FMR
 ener
giz
ed
HGV
 ener
giz
ed
WV
 ener
giz
ed
Ther
mist
or t
emper
atur
reaches 48
°F (9°C) 
(3.9 kΩ or less).
 Har
vest 
timer st
ar
ts (1 t
o 3 min.).
FS
 open
Comp
 contin
ues
FMR
 contin
ues
FM
 ener
giz
ed
L
LV
 ener
giz
ed
 
PM
 ener
giz
ed 
HGV
 de-ener
giz
ed
WV
 de-ener
giz
ed
FS
 closed
Comp
 contin
ues
FMR
 contin
ues
HGV
 ener
giz
ed
PM
 de-ener
giz
es f
or 2 sec.,
       then r
ev
er
ses f
or 1
0/20 sec.
FM
 de-ener
giz
ed
L
LV
 de-ener
giz
ed
FS
 chec
k
St
ar
tup
If 
FS
 is open, C
omp st
ops and c
ycle r
etur
ns t
o 1
-min.
 fi
ll.
5-min.
 timer in 
contr
ol
FS
 closed
FS
 opens or 
fr
eez
e timer 
ter
minat
es
1.
 Bin F
ull
   
W
ithin 1
0 sec.
 af
ter ice cont
acts BC b
ulb
,
   icemak
er s
huts do
wn.
Shutdo
wn 
and R
estar
t
BC 
Oper
ation
Ice cont
acts BC b
ulb
2.
 Icemak
er Of
f
   
All components 
 
   de-ener
giz
ed.
3.
 Ice Le
vel Lo
w
er
ed
    No ice t
ouching BC b
ulb
    Icemak
er st
ar
ts at 
    "1
. 1
-Min
ut
e F
ill C
ycle
."
BC
 closed
BC
 open
All components 
de-ener
giz
ed
To
 1
. 1
-Min
ut
e F
ill Cy
cle
NO
TE:
 "G" contr
ol boar
d 
gr
een 
"BC 
CL
OSED" 
LED 
   
             
on contin
uousl
y when the K4 jumper is in place
.