Hoshizaki SRH/3 KM-1400SWH-M 用户手册

下载
页码 101
18
•  
WV
 time:
 6 min.
 or the length of har
vest min
us 50 
sec.
 (S4 dip s
witch 7), whiche
ver is shor
ter
. Do not 
adjust S4 dip s
witch 7 out of the f
act
or
y position.
• Max.
 har
vest time:
 20 min.
 
FS
 chec
k
1 t
o 3-min.
 har
vest timer
 in 
contr
ol (S4 dip s
witch
 1 & 2)
Leg
end:
 
BC
–bin contr
ol
Comp
–compr
essor
FM
–f
an mot
or
FMR
–f
an mot
or
-r
emot
e
FS
–fl
oat s
witch
HGV
–hot g
as v
al
ve
L
LV
–liquid line v
al
ve
PM
–pump mot
or
WV
–inlet w
at
er v
al
ve
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "W
A
SH" P
osition
The "W
A
SH" position on the contr
ol s
witch is used when cleaning and sanitizing the unit.
 W
hen in the "W
A
SH" position, 
po
w
er is supplied t
o the pump mot
or
. W
ith the cleaning v
al
ve closed, the cleaner and sanitiz
er fl
ow o
ver the outside of the 
ev
apor
at
or plat
e assemb
ly
. W
ith the cleaning v
al
ve open, the cleaner and sanitiz
er fl
ow o
ver both the outside and the inside 
of the e
vapor
at
or plat
e assemb
ly
Not
e:
 Close the cleaning v
al
ve af
ter cleaning and sanitizing ar
e complet
e, otherwise the unit will not r
est
ar
t when the contr
ol 
 
          s
witch is placed in the "ICE" position.
"G" Contr
ol Boar
d with Har
vest P
ump 
Timer Oper
ation Flo
w Char
t
1.
 1
-Min
ut
e  
 
   
 F
ill Cy
cle
C
ycl
e
 
St
eps
2.
 Har
vest Cy
cle
Ther
mist
or 
in contr
ol
3.
 F
reez
e Cy
cle
• Min.
 fr
eez
e time:
 5 min.
• Max.
 fr
eez
e time:
 fr
eez
e timer set
ting 
(S4 dip s
witch 9 & 1
0)
FS
 in contr
ol 
4.
 P
ump-Out Cy
cle
• F
act
or
y set f
or e
ver
10th c
ycle 
 
(S4 dip s
witch 5 & 6)
• P
ump mot
or st
ops f
or 
sec., then r
ev
er
ses 
for 1
0/20 sec.
  
(S4 dip s
witch 3 & 4)
WV
 ener
giz
ed
FS
 open
Comp
 ener
giz
ed
FMR
 ener
giz
ed
HGV
 ener
giz
ed
WV
 ener
giz
ed
Ther
mist
or t
emper
atur
reaches 48
°F (9°C) 
(3.9
 kΩ or less).
   
Har
vest timer st
ar
ts
.
FS
 open
Comp
 contin
ues
FM
 contin
ues
FMR
 contin
ues
PM
 contin
ues
L
LV
 ener
giz
ed
HGV
 de-ener
giz
ed
FS
 closed
Comp
 contin
ues
FMR
 contin
ues
HGV
 ener
giz
ed
PM
 de-ener
giz
es f
or 2 sec.,
       then r
ev
er
ses f
or 1
0/20 sec.
FM
 de-ener
giz
ed 
 
(FM contin
ues on KM-1
60
1S
AH)
LL
de-ener
giz
ed
FS
 chec
k
Star
tup
If 
FS
 is open, C
omp st
ops and c
ycle r
etur
ns t
o 1
-Min.
 fi
ll.
5-min.
 timer 
in contr
ol
FS
 closed
FS
 opens or 
fr
eez
e timer 
ter
minat
es
NO
TE:
 Gr
een "BC CL
OSED" LED on contin
uousl
 
            when the K4 jumper is in place
.
50 sec.
PM 
ener
giz
ed
WV
 de-ener
giz
ed
Har
vest P
ump 
Timer
2. "G" Control Board with Harvest Pump Timer Operation 
1.
 Bin F
ull
   
W
ithin 1
0 sec.
 af
ter ice cont
acts BC b
ulb
,
   icemak
er s
huts do
wn.
Shutdo
wn 
and R
estar
t
BC 
Oper
ation
Ice cont
acts BC b
ulb
2.
 Icemak
er Of
f
   
All components 
 
   de-ener
giz
ed.
3.
 Ice Le
vel Lo
w
er
ed
    No ice t
ouching BC b
ulb
    Icemak
er st
ar
ts at 
    "1
. 1
-Min
ut
e F
ill C
ycle
."
BC
 closed
BC
 open
All components 
de-ener
giz
ed
To
 1
. 1
-Min
ut
e F
ill Cy
cle