Beckett SLD4100 用户手册

下载
页码 32
 
3
Table of Contents 
 
Ratings and Data………………………………………………………………………4   
 
Clearances……………………………………………………………………..............5 
 
Ventilation and Combustion Air………………………………………………………5 
 
Boiler Assembly……………………………………………………………….............6 
 Temperature 
control 
Installation 
and 
Adjustment 
    
 
 
Boiler Trim Piping 
 
 
 
 
 
 
 Jacket 
Installation 
 
 
 
 
 
 
  
System Piping………………………………………………………………...……….9 
 Bypass 
Piping 
       
 
 
Low Water Cut-Off 
 
 
 
 
 
 
 
Relief Valves   
 
 
 
 
 
 
 Expansion 
Tanks       
 
Venting Systems……………………………………………………………………...10 
 Chimney 
Venting 
     
 
Direct Venting   
 
 
 
 
 
 
 
Burner Installation……………………………………………………………….…...14 
 
Oil Tank and Piping……………………………………………………………….….15 
Wiring…………………………………………………………………………..……..15 
 
Swing Door……………………………………………………………………..……..18 
 Opening 
the 
Door 
 
Closing the Door 
 Door 
Hinge 
Reversal 
 
Operation………………………………………………………………………..……..18 
 
Sequence of Operation 
 Start 
Up 
 
Start Up Equipment 
 Burner 
Adjustments 
 
Control Circuit Safety Checks 
 
Maintenance……………………………………………………………………..…….21 
 Boiler 
 Oil 
Burner 
 Vent 
System 
 
Domestic Water Tank……………………………………………………………..…..22 
.. 
Trouble Shooting Guide………………………………………………………..……...23 
 
Parts Diagrams…………………………………………………………………..……..25 
 
Warranty …………………………………………………………………………..…..26