用户手册目录DIMENSIONAL DRAWING3SPECIFICATIONS4ACCESSORIES5PRETEST THE LIFT BEFORE INSTALLING6INSTALL THE LIFT7General Guidelines7Installation in a Suspended Ceiling (using threaded rods)8CONNECT POWER TO THE LIFT10Non Plenum Rated Installation10Plenum Rated Installation10(OPTIONAL) INSTALLING WIRING COVER11INSTALL THE PROJECTOR ON THE LIFT12Install and Route Cables12ADJUSTMENTS13Adjust Travel13Adjust the Aim of the Projector13OUTSIDE TERMINAL WIRING EXAMPLES14Push Button14Supplied SPST Switch Using External Power Supply14Latching15Internal 12VDC Power Supply 2.5A Maximum15Internal 24VAC Power Supply, 1.2A Max15Internal Dry Contact Closures15Service Position15INSIDE TERMINAL WIRING EXAMPLES16Push Button16Supplied SPST Switch Using External Power Supply16Latching17Internal 12VDC Power Supply 1.2 A Maximum17Internal 24VAC Power Supply, 2.5 A Maximum17Internal Dry Contact Closures17Low Voltage Sensing:17Service position17INTERIOR TERMINAL DESIGNATIONS18EXTERIOR TERMINAL DESIGNATIONS20TROUBLESHOOTING22文件大小: 709.4 KB页数: 24Language: English打开用户手册