INSTALL LEVELING LEGS
2. 
Screw in leveling legs
Examine leveling legs. Using a wrench, screw legs into leg 
holes until foot flange touches the base. Foot is fully installed 
when bottom of foot is approximately 1/2" (13 mm) from 
bottom of dryer.
Now stand the dryer on its legs. Slide the dryer until it is 
close to its final location. Leave enough room for electrical 
connection and to connect the exhaust vent.
Prepare dryer for leveling legs
1. 
To avoid damaging floor, use a large flat piece of cardboard 
from dryer carton; place under entire dryer. Firmly grasp 
dryer body (not console panel) and gently lay dryer down on 
cardboard.
IMPORTANT: If laying dryer on its back, use the cardboard 
corner posts the dryer was packed with to avoid damaging 
the back of the dryer. Lay the dryer on its side if you do not 
have the cardboard corner posts the dryer was packed with.
Flange
Connect gas supply to dryer
 1.
Remove red cap from gas pipe. Using a wrench to tighten, 
connect gas supply to dryer. Use pipe-joint compound  
on threads of all non-flared male fittings. If flexible metal  
tubing is used, be sure there are no kinks.
NOTE: For LP gas connections, you must use pipe-joint 
compound resistant to action of LP gas. Do not use  
TEFLON
®†
 tape.
MAKE GAS CONNECTION
A
B
Non-flared  
male fitting
Flared  
male fitting
Open shut-off valve
 3.
Open shut-off valve in supply line; valve is open when handle 
is parallel to gas pipe. Then, test all connections by brushing 
on an approved noncorrosive leak-detection solution. 
Bubbles will show a leak. Correct any leaks found.
A
 Open valve 
Closed valve
A
B
C
D
Plan pipe fitting connection
 2.
A combination of pipe fittings must be used to connect dryer 
to existing gas line. A recommended connection is shown. 
Your connection may be different, according to supply line 
type, size, and location.
A. 3/8" flexible gas connector
B. 3/8" dryer pipe 
C. 3/8" to 3/8" pipe elbow
D. 3/8" pipe-to-flare adapter fitting