VeNtING INStAllAtIoN 
   The maximum angular variation allowed in the system 
is 70°. Figure 31
   The minimum height of the vent above the highest point 
of penetration through the roof is 1' (305 mm). 
1
2
3
4
1
2
3
4
FP1179
max bends
Example:  Elbow 1   =   90°
 
Elbow    =   45°
 
Elbow 3   =   45°
 
Elbow 4   =   90°
 
Total Angular   =   70°
 
Variation
FP1179
Figure 31 - 
Maximum Elbow Usage
INStAllAtIoN FoR VeRtICAl teRMINA-
tIoN 
1.  Determine the route your vertical venting will take. If 
ceiling joist, roof rafters or other framing will obstruct 
the venting system, consider an offset. Refer to 
Figure 32 to avoid cutting load bearing members. 
Note: Pay special attention to these installation instructions 
for required clearances (air space) to combustibles when 
passing  through  ceilings,  walls,  roofs,  enclosures,  attic 
rafters, etc. Do not pack air spaces with insulation. Also 
note maximum vertical rise of the venting system and any 
maximum  horizontal  offset  limitations.  Offsets  must  fall 
within the parameters shown in Page 16, Figure 13.
.  Set  fireplace  in  desired  location.  Drop  a  line  plumb 
down from the ceiling to the position of the flue exit. 
Mark the center point where the vent will penetrate the 
ceiling. Drill a small locating hole a this point. 
 
Drop a plumb line from the inside of the roof to the ceil-
ing locating hole in the ceiling. Mark the center point 
where  the  vent  will  penetrate  the  roof.  Drill  a  small 
locating hole at this point. 
FlAt CeIlING INStAllAtIoN
1.  Cut a 10Z\x" (67mm) square hole in the ceiling using 
the locating hole as a center point The opening should 
be  framed  to  10Z\x"  x  10Z\x"  (67  x  67  mm)  inside 
dimensions  as  shown  in  Figure  34  using  framing 
lumber the same size as the ceiling joist. If the area 
above the ceiling is an insulated ceiling or a room, nail 
firestop from the top side. This prevents loose insula-
tion  from  falling  into  the  required  clearance  space. 
Figure 33. Otherwise, install firestop below the framed 
hole. The firestop should be installed with no less than 
three nails per side. Figure 33
.  Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system flue up through 
the firestop. Be sure pipe and elbow connections are 
fully twist-locked. Page 17, Figure 15 
3.  Cut  a  hole  in  the  roof  using  the  locating  hole  as  a 
center  point.  (Cover  any  exposed  open  vent  pipes 
before cutting hole in roof). The 10Z\x" x 10Z\x" (6 x 
67 mm) hole must be measured on the horizontal. 
Actual length may be larger depending on the pitch of 
the roof. There must be a 1" minimum clearance from 
the  vent  pipe  to  combustible  materials.  (Insulation 
should be considered a combustible material) Frame 
the opening as shown on Page 17, Figure 16
4.  Connect a section of pipe and extend up through the 
hole.
FP1969
offset w/ wallstrap
Figure 32 - 
Offset with Wall Strap and 45° Elbows 
Roof Flashing 
Wall Strap 
45° Elbows 
Ceiling Firstop 
FP1669