Enviro C-11290 User Manual

Page of 48
3.  To install the Round Support Box/Wall Thimble in 
a flat ceiling, cut a 10” square hole in the ceiling, 
centered in the hole drilled in Step 2. Frame the 
hole as shown in Figure 30.
4. Assemble the desired lengths of black pipe and 
elbows  necessary  to  reach  from  the  appliance 
adapter  up  through  the  Round  Support  Box. 
Insure that all pipe and elbow connections are in 
their fully twist-locked position.
5. Cut  hole  in  the  roof  centered  on  the  small 
hole  placed  in  the  roof  from  Step  2.  The  hole 
should  be  of  sufficient  size  to  meet  minimum 
requirements for Clearance to Combustibles, as 
specified. Continue to assemble lengths of pipe 
and elbows necessary to reach from the ceiling 
support box up through the roof line. Galvanized 
pipe and elbows may be utilized in the attic, as 
Figure 30: Wall Framing for Hole for Vertical 
Installation. 
well as above the roof line. The 
galvanized  finish  is  desirable 
above  the  roof  line,  due  to  the 
higher corrosion resistance.
6. Once  the  pipe  sections  have 
been joined, and run up through 
the hole in the roof, slip an elbow 
strap over the exposed sections, 
bend 
the 
support 
straps 
outwards,  and  push  the  elbow 
strap down to the roof level, as 
shown in Figure 31. Tighten the 
clamp  around  the  pipe  section. 
Use  a  level  to  make  sure  the 
pipe  is  truly  vertical.  With 
roofing nails, secure the support 
straps to the roof. Seal the nails 
holes heads with non-hardening 
mastic. Trim the excess length of 
Initial Installation
QUALIFIED INSTALLERS ONLY
v
eRticaL
 i
nstaLLation
:
1. Check  the  instructions  for  required  clearances  (air  spaces)  to  combustibles  when  passing through 
ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air 
spaces with insulation.
2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position 
of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small 
hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, 
mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other 
framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid 
cutting load bearing members.
Vertical 
Termination
Storm Collar
Flashing
Roofing nails
Elbow Strap
Figure 31: Vertical Vent Termination Installation.
22