Enviro EG40 BV User Manual

Page of 23
Initial Installation
QUALIFIED INSTALLERS ONLY
T
ERMINATION
:
7
� �� ���� ���
�������
������ ����� ����
������� ������ ����
������������
� �� ���� ���
�������
�� �� ����� ���
Figure 3: Height of Vertical Termination. 
The  bottom  of  the  vent  cap  shall  extend  at 
least 2 feet (0.61 m) above the highest point 
of  the  roof  where  it  passes  through  and  at 
least 2 feet (0.61 m) higher than any portion 
of the roof within a horizontal distance of 10 
feet (3.1 m). 
See vent manufacturer’s instructions for vent 
system  clearances  to  combustibles  and  vent 
terminal clearance from roof.
I
NSTALLATION
 I
NTO
 A
N
 E
XISTING
 C
HIMNEY
:
Figure 4: Installation into an existing chimney. 
This basic venting configuration shown are rough guidelines only.  
Follow national and local codes for other installation options.
Measure  the  height  of  the  chimney  beforehand  and  purchase 
the appropriate kit. Never attempt to over stretch a flexible liner 
to accommodate the height of the chimney.
• Any flue damper must be removed or locked permanently in 
the open position.
•  The  chimney  must  be  clean,  in  good  working  order  and 
constructed out of non-combustible materials.
• Make sure that all chimney clean-outs are tightly fitting and will 
not permit air to leak into the chimney.
• Make all gas connections and check for leaks.
See vent manufacturer’s instructions for vent system clearances 
to combustibles and vent terminal clearance from roof.