Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1555
SW-CTL (Switch Control) 
9
downlink port board messages to the Switch Control than the Switch 
Control is able to process. A WARNING alarm for this condition will 
automatically be resolved if no errors of this type are detected within a 15 
minute period. If no other errors are logged but 2561 errors are occurring 
at a high rate (more than 10 in the last hour), follow normal escalation 
procedures.
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Switch Control Reset Test for example, you may also clear errors generated from 
other tests in the testing sequence.
Switch Control Channel Interface Test (#92)
Loop-back messages are sent to the Switch Control via the interface used for 
control channel messages. The messages are returned to the SPE for verification 
via the same interface. The TDM bus is not involved in this test since the 
messages are looped back on the MSSNET circuit pack.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Board 
Sequence
D/ND
1
1.
D = Destructive, ND = Non-destructive
Switch Control Reset Test (#93)
X
D
Control Channel Interface Test (#92)
X
X
ND
Control Channel Transmission Test 
(#94)
2
2.
When the SPE is duplicated, this test runs only on the Switch Control circuit on the active SPE. An
interchange must be performed to test the other one.
X
X
ND