Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Architecture 
1-27
Power Interruptions 
1
Nominal Power Holdover
AC-powered multicarrier cabinets are equipped with an internal battery, powered 
by its own charger, that provides a short term holdover to protect the system 
against brief power interruptions. This feature, known as the Nominal Power 
Holdover, is optional on cabinets supplied by a UPS and required on all other 
AC-powered cabinets. The battery is controlled in such a manner that it 
automatically provides power to the cabinet if the AC service fails. The duration 
of the holdover varies according to the type of carrier and whether or not the 
system has a duplicated SPE. See 
Table 1-7
 for duration times:
Effects of Power Interruptions
Power holdover is controlled by software in the above manner in order to allow 
the system to sustain multiple brief power interruptions without exhausting the 
batteries before they have time to recharge. After power is restored, the batteries 
are recharged by a circuit that monitors current and time. If the batteries take 
more than 30 hours to recharge, a minor alarm is raised, indicating that the 
batteries must be replaced or the charger replaced.
The 397 Battery Charger Circuit immediately detects loss of AC power and raises 
a warning alarm against AC-POWER that is not reported to INADS. Certain 
maintenance objects such as external DS1 timing will report major alarms in this 
situation. When power is restored, the AC-POWER alarm is resolved.
PPN Cabinet with Power Holdover
When power is interrupted to a PPN cabinet, the effects depend upon the 
duration of the outage. Battery power is supplied to the whole cabinet for 10 
seconds. If power is restored during that period, service is not affected. If the 
interruption exceeds the cabinet holdover period, but is restored before the 
control carrier holdover expires, all service is dropped and emergency transfer is 
invoked. The SPE is kept up allowing for a speedy restoration of service since a 
reboot is not required. All non-SPE circuit packs must be reinserted, taking about 
a minute, depending on the size of the system. If the interruption exceeds the 
control carrier holdover, all service is dropped and the system must reboot when 
Table 1-7.
Nominal Power Holdover
Cabinet Type
Control Carrier
Entire Cabinet
PPN, duplicated SPE
5 minutes
10 seconds
PPN, simplex SPE
10 minutes
10 seconds
EPN
10 minutes
15 seconds