Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
G3vs with Intel 386 or Risc Processor to R8r 
4-9
Remove the Present System 
4
Shut Down DEFINITY AUDIX System
!
WARNING:
Neglecting to shut down an AUDIX assembly before powering down the 
system cabinet where it resides can damage the AUDIX disk.
1. If a DEFINITY AUDIX System resides in the system to be upgraded, shut 
down the AUDIX assembly and allow the disk to completely spin down. 
Refer to 
.
2. Unseat the AUDIX assembly from its backplane connectors.
Power Down Present System
!
CAUTION:
Powering down the PPN will cause important system data, such as BCMS 
data, records of queued ACD calls, Automatic Wakeup requests, and Do 
Not Disturb requests to be lost. Refer to DEFINITY Enterprise 
Communications Server Release 8 Maintenance for R8r, for information 
about preparing the system for a power down.
1. At the PPN cabinet power supply, set the main circuit breaker to OFF.
Install Emergency Transfer Ground Wire
!
CAUTION:
To avoid contaminating single-point ground, do not connect the ground 
strap while the system is powered up.
1. Connect a 10 AWG (#25) (2.6 mm
2
) wire either to pin 49 of the connecting 
block or to pin 49 of the CAP (cable access panel) associated with the 
emergency transfer panel.
2. Route the other end of the wire to an approved ground and connect.