Multicarrier G2 Universal Module to R8r EPN 
5-110
Critical Reliability 
5
Set Additional Administration
1. Type list configuration software-version long and press 
Enter 
to 
compare the version number of the Release 8 software program 
(displayed on the terminal) with the version number (written on a label on 
the processor’s faceplate). If the version numbers are not the same, 
change the version number on the processor label so that they agree.
2. Type change system-parameters customer-options and press 
Enter
Use this screen to enable the G3 V6 option and to assign the customer’s 
other right-to-use options on the Release 8 upgrade order. See 
DEFINITY 
Enterprise Communications Server Release 8 Administrator’s Guide, for 
details on enabling these options.
3. Type change site-data and press 
Enter
. Use this screen to assign 
system-specific information (such as building, floor, stations, and so 
forth).
4. Type status system 1 and press 
Enter 
to verify that the system is in the 
“active/standby” mode.
5. Type save translation and press 
Enter
. This instructs the system to write all 
translation information from memory to the translation cards.
!
WARNING:
If the terminal screen displays “translation corruption detected; call 
Lucent Technologies distributor immediately”, an error was detected 
in the translations. Call your Lucent Technologies representative.
Close Upgraded EPN Cabinet and Reconnect
Cables
1. At the upgraded EPN, set the main circuit breaker to OFF.
NOTE:
Powering down an EPN without powering down the PPN will set off 
alarms. However, these alarms should clear after power is restored 
to each EPN.
2. Temporarily disconnect the lightwave transceivers and fiber optic cables 
from the appropriate carriers.
3. Replace the back doors or back panels previously removed.
4. At the EPN cabinet, reconnect the lightwave transceivers, fiber optic 
cables, and the connector cables associated with the carrier being 
replaced.
5. Install the front door on the EPN cabinet.