Multicarrier G2 Universal Module to R8r EPN 
5-111
Critical Reliability 
5
Power Up the EPN Cabinets
1. At each EPN power distribution unit, set the main circuit breaker to ON. 
After about 40 seconds, EPN power and PPN/EPN communications return.
2. After power returns to each EPN and all trouble is cleared, verify that the 
EMERGENCY TRANSFER CONTROL switch is set to AUTO. This restores 
the system to the normal mode.
Retranslate Port Circuits
If port circuit packs were relocated in order to put:
A critical port circuit pack, requiring longer nominal battery holdover (such 
as a DS1 or an Announcement circuit pack), in a port slot
A TN736, TN752, or TN755 power supply in port slots “18” and “19”
A TN776 or TN570 Expansion Interface in port slot “1”
A TN776 or TN570 in port slot “2” (for a second directly connected EPN)
of the new expansion control carrier, verify that they were retranslated during the 
off-site software upgrade. If not, they must be retranslated now. Refer to 
DEFINITY Enterprise Communications Server Release 8 Administrator’s Guide.
Enable TTI
1. Type change system-parameters features and press 
Enter
.
2. On the second screen, set the 
Enabled?
 field to y to activate the TTI 
feature.
Check Link Status
1. Type display communication-interface links and press 
Enter
. Compare it 
with the earlier status.
2. Type status link 
number and press 
Enter
. Repeat this step for each link.
Enable Scheduled Maintenance
Type change system-parameters maintenance and press 
Enter
. Enable the 
scheduled daily maintenance.