Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-80
Add a Control Carrier (Add Duplication) 
6
Add a Control Carrier (Add 
Duplication)
To upgrade a standard-reliability system to a high- or critical-reliability DEFINITY 
ECS Release 5 system, a second control carrier is added to carrier position “B” 
of the existing multicarrier cabinet PPN.
Service Interruption
1. Since the addition of the second control carrier requires a service 
interruption, notify the customer in advance as to when the addition will be 
carried out.
Verify System Status
1. Before proceeding, the system should be examined for alarms, and every 
problem should be corrected. The system must be alarm-free.
Disable Alarm Origination
1. Type change system-parameters maintenance and press 
Enter
.
2. Make a note of the 
Alarm Origination Activated 
field 
administration. If the feature is enabled, type 
n
 in this field and press 
Enter
 
to disable Alarm Origination. This will be activated again later. 
!
WARNING:
If you do not disable Alarm Origination before making changes to the 
switch, the switch may generate alarms, resulting in unnecessary 
trouble tickets. Reducing redundant and unnecessary trouble tickets 
is critical for measuring the quality of Lucent services and products.
NOTE:
For earlier releases of the system software, you may also need to 
disable 
Cleared Alarm Notification 
and 
Restart 
Notification
 fields before you can submit the form successfully.