Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-108
Add a Switch Node Carrier (High or Critical Reliability) 
6
Add a Switch Node Carrier (High or 
Critical Reliability)
To upgrade to a high or critical reliability R8r, a second switch node carrier is 
added either to an empty “E” carrier position of an existing multicarrier port 
network or to the “D” carrier position (as the duplicate switch node carrier) of an 
existing multicarrier cabinet.
NOTE:
To avoid moving a port carrier, the preferred practice is to place the new 
switch node carrier in an empty carrier position.
Service Interruption
1. Since the addition of the second switch node carrier requires a service 
interruption, notify the customer in advance as to when the addition will be 
carried out.
Verify System Status
1. Before proceeding, the system should be examined for alarms, and every 
problem should be corrected. The system must be alarm-free.
Disable Alarm Origination
1. Type change system-parameters maintenance and press 
Enter
.
2. Make a note of the 
Alarm Origination Activated
 field 
administration. If the feature is enabled, type n in this field and press 
Enter
 
to disable Alarm Origination. 
!
WARNING:
If you do not disable Alarm Origination before making changes to the 
switch, the switch may generate alarms, resulting in unnecessary 
trouble tickets. Reducing redundant and unnecessary trouble 
tickets.
NOTE:
For some releases of the system software, you may also need to 
disable 
Cleared Alarm Notification
 and 
Restart 
Notification
 fields before submitting the form.