Siemens Software version syngo CT 2005C User Manual

Page of 321
syngo Dynamic Evaluation
 
315
6. Enhancement Curve
As soon as you have defined an ROI, an enhancement 
curve (time-density curve) is calculated and displayed 
in the fourth segment. To facilitate identification, this 
curve has the same color and numbering as the associ-
ated ROI. The maximum CT-value of the ROI first drawn 
is indicated by a dashed sampling line.
In the table, for each ROI, the following parameters are 
given:
• Peak [HU]: Highest CT value detected in the ROI.
• Time to Peak [s]: Period of time in seconds from the 
time when the first image was acquired (Delay = 0) 
or the time when the contrast was injected 
(Delay > 0) to the time when the highest CT value is 
reached in an ROI.
• Sample [HU]: CT value at the point of time (in sec) 
where the vertical line is positioned on the enhance-
ment curve.
Absolute/Relative Enhancement curve
The enhancement curves are displayed as absolute or 
relative curves.
• The Absolute Enhancement curve displays the origi-
nal CT-value derived at every point in time during the 
examination.
• The Relative Enhancement curve displays the varia-
tion of CT-values with reference to the CT-values in 
the baseline image at every point in time.
C2-025.630.01.01.02_APPLICATIONGUIDE_SPIRIT.book  Page 315  Friday, April 8, 2005  9:55 AM